Underwater Construction Corporation assisted in a geological survey off the coast of Wisconsin in Lake Michigan. Core samples of the lake-bed were analyzed to provide information for future construction designs for a fossil fuel plant.
UCC worked as a subcontractor to provide the 110 ton jack up barge The Jasper as a drill platform. Ten holes were drilled in twenty-one days to at a depth of 300 feet in approximately 40 feet of water.
|
|