access@meticulosity.com

Home/David Ward

About David Ward

This author has not yet filled in any details.
So far David Ward has created 4 blog entries.

Hydroelectric Dam Intake Debris Removal

UCC’s underwater inspection teams complete many FERC Part 12 inspections for the Hydroelectric industry throughout the U.S., working directly for the utility owner/operator or the independent consultant.  Many times these inspections identify repairs or maintenance that UCC performs at a later date. Following a summer 2020 inspection at a dam’s [...]

2021-10-14T16:48:30+00:00October 13th, 2021|Hydro|

Water Intake – The Wedge Wire Screen Structure

Many power utility plants, industrial processing facilities and water utilities are turning to the Wedge Wire Intake Structure as a primary component for raw water intakes. The T-intakes and half intakes are simple yet robust structures and are being installed in many bodies of water throughout the U.S. Since [...]

2020-10-01T18:57:42+00:00October 1st, 2020|UCC News|

Circulating Water Intake Pipeline – Returning to the Depth

Year after year, maintenance or preventative maintenance (PM) projects are performed for many of UCC’s diverse customer base. Some of these projects are as needed while others are on a formal routine PM schedule. However, at a Midwest power plant, this technical service and approach is anything but routine. [...]

2020-03-14T21:18:21+00:00April 30th, 2019|Marine Services, UCC News|

UCC’s Anniversary: Celebrating 50 Years of Commercial Diving, & Marine Construction

Underwater Construction Corporation is celebrating its 50th anniversary this year. Founded in 1969 by John Chiangi, Sr. and Stuart Leech, UCC has grown to be the largest inland commercial diving firm in the United States. Click the logo below to view our timeline. [...]

2021-09-17T19:45:12+00:00January 3rd, 2019|Press Releases, UCC News|