SmartFeed™ Sludge Dewatering Systems

smartfeed

SmartFeed™ Serves You

When your slurry dewatering project depends on polymer precision, the patent-pending SmartFeed™ sludge dewatering system delivers consistent, real-time dosing accuracy. Unlike traditional sludge dewatering technologies that rely on manual adjustments or static settings, SmartFeed™ continuously analyzes slurry conditions and adjusts chemical dosing automatically to match actual field parameters.

Every SmartFeed™ application is custom-tailored for the specificslurry or sludge at your project site. Whether your project involves wastewater lagoons, industrial ponds, or dredged sediments, SmartFeed™ helps optimize polymer usage, improve throughput, and reduce operational risk.

SmartFeed™ Starts with Science

Successful dewatering begins with accurate data. SmartFeed™ eliminates guessworkby using real-time monitoring and algorithmic dosing control to deliver the right polymer blend at the right rate throughout your project.

By adjusting automatically for variations in flow rat, solids concentration, of pH, the system helps ensure optimal dewatering performance, even as site conditions shift.

  • Real-time monitor and control
  • Automated polymer dosing
  • Consistent dewatering quality
  • Reduced labor intervention and chemical waste
smartfeed

Lab-Backed Precision Through Rapid Testing

Samples of your project’s slurry are tested to ensure the SmartFeed® sludge dewatering system calculates peak performance parameters that serve your project.

The Rapid Dewatering Test (RDT), made with a small sample of your slurry, determines which polymers and dose rate will best serve your project’s needs. The Pressure-Geotube® Dewatering Test (P-GDT) uses a larger sample of your slurry to confirm polymer dose rates and project the mass-balance the SmartFeed™ system will maintain.

These lab results establish baseline operational parameters, ensuring r the SmartFeed™ sludge dewatering system is dialed in for maximum efficiency from day one.

Real-Time Adjustments Keep Your Project Flowing

As project conditions change, SmartFeed™ adapts automatically. It continuously monitors critical slurry variables, such as flow rate, density, percent fry solids, pH, polymer shear, and coarse grain size percentage, and adjusts chemical dosing in real time.

This smart automation prevents performance dips caused by fluctuating field conditions and delivers:

  • Consistent Geotube® filling performance
  • Improved filtrate clarity and water quality
  • More predictable dewatering timelines
  • Less chemical waste and operator oversight

The SmartFeed™ sludge dewatering system also generates processing  for each Geotube® container, providing full visibility and traceability for QA/QC documentation.

SmartFeed™ Benefits Almost Any Dewatering Project

The SmartFeed™ sludge dewatering  system can be applied to virtually any polymer-assisted dewatering project, including:

  • Dredged sediment and silt removal
  • Mining and energy sector operations
  • Power plant and industrial process lagoons and ponds
  • Nuclear power plant cooling bays and environmental remediation projects
  • Wastewater and stormwater lagoons

It’s scalability makes it ideal for both small and large operations that require precise chemical control and reliable results. If you have a complex dredging or diving operation that needs polymer and total quality management reporting, you need the SmartFeed™ sludge dewatering system.

“I found the daily process benchmarking provided by the SmartFeed™ system, with on-site support of Mineral Processing Services’ filtration manager, invaluable in making daily decisions about our pumping methods. The SmartFeed™ process and Geotube® containers allowed us to pump our holding basins at whatever flow rate and percent solids we could achieve without causing upset to the filtrate quality. I look forward, in a few months, to the SmartFeed™ system again filling the Geotube® containers in half the time, with various pumping methods, resulting in more savings for our operations budget!”

– Braintree Water Treatment Plant Staff

View Case Studies

Smartfeed™ Steps to Project Success

FAQs About Sludge Dewatering Systems

Unlike static dosing systems, SmartFeed™ uses real-time monitoring and automated adjustments to maintain optimal polymer dosing, reducing chemical waste and improving dewatering consistency.
SmartFeed™ continuously monitors flow rate, pH, percent solids, density, polymer shear, and grain size percentages, adjusting dosing accordingly.
The system works with a wide range of cationic and anionic polymers, selected based on lab testing of site-specific slurry characteristics.
Yes. SmartFeed™ can complement most sludge dewatering technologies, including Geotube® systems, clarifiers, and other mechanical dewatering processes.
By ensuring polymers are dosed accurately in real time, SmartFeed™ minimizes chemical waste, reduces operator intervention, shortens project timelines, and improves water quality, resulting in measurable cost savings.
SmartFeed™ is modular and scalable. It can be mobilized for temporary projects or integrated into permanent dewatering infrastructure.

Leverage Our Sludge Dewatering System Expertise

The UMPS team has extensive experience designing and implementing advanced sludge dewatering systems for municipal, industrial, and environmental projects. Whether you’re managing a complex dredging operation or optimizing polymer-assisted dewatering, SmartFeed™ offers the precision and efficiency your project demands.

Contact us today to speak with our dewatering specialists and find out how SmartFeed™ can enhance your slurry and sludge management program.

Questions?
Contact James E. Meagher
207-741-2955
207-751-4416 (cell)
860-767-8256 x. 136 (office)
[email protected]