Dam Spillway Gate Sill Plate Replacement
An underwater inspection was performed determining that a sill plate was deteriorated beyond repair and then confirmed by engineering review. Using hydraulic underwater cutting equipment the old sill plate and concrete was carefully removed. Concrete forms were fabricated and installed underwater allowing UCC to place new concrete. Installation consisted of [...]