Dam Spillway Gate Sill Plate Replacement

An underwater inspection was performed determining that a sill plate was deteriorated beyond repair and then confirmed by engineering review. Using hydraulic underwater cutting equipment the old sill plate and concrete was carefully removed. Concrete forms were fabricated and installed underwater allowing UCC to place new concrete. Installation consisted of [...]

2022-07-27T20:14:43+00:00January 4th, 2015|

Dam Spillway Apron Repair

Underwater inspections determined that 19 of 24 spillway block sections were subjected to years of erosion. UCC provided skilled divers and specialized underwater tooling to remove the damaged concrete. The substandard rebar was removed using an exothermic cutting torch and new rebar matting was installed as required by engineering specification. [...]

2022-07-27T20:15:12+00:00January 3rd, 2015|