Dam Spillway Apron Repair

Underwater inspections determined that 19 of 24 spillway block sections were subjected to years of erosion. UCC provided skilled divers and specialized underwater tooling to remove the damaged concrete. The substandard rebar was removed using an exothermic cutting torch and new rebar matting was installed as required by engineering specification. [...]