Air Diving Experience
Project Type

Project Description
- Hydroelectric Facility
-   Work Scope – Head Gate Rail and Cable Tray Service
- Â Â Â Drilling and Anchor Installations
- Â Â Â Rock and Other Debris Removal
- Â Â Air Surface Supplied Diving
-   Depth – 167 Feet
-   Number of Dives – 250
- Â Â Unique Variables
- Â Â Specialized Navy Dive Table and Schedule due to 2400 Feet Altitude
- Â Â Surface Decompression in a Chamber and In-Water Decompression was Utilized
- Â Â Nitrox was Utilized During Decompression for Additional Diver Safety